Anchors – 3PC Kit
$1.75
Description
Spindle, Prong and Nylon Insul-Anchors simplify the permanent installation of insulation to porous construction surfaces and non-weldable materials. They can be applied quickly and easily using only a putty knife or caulking gun and General Purpose Adhesive(not included with purchase fo anchors).
Step 1. Wipe Surface Clean
Anchor must be applied to a clean, dry and non-porous surface.
Step 2. Apply Adhesive to Anchor
Spread a daub of General Purpose Adhesive IHA-170 onto the perforated base with putty knife.
Step 3. Stick Anchor In Place
Press anchor into position with twisting motion to spread adhesive evenly. (Adhesive should protrude through perforations and beyond base edges.) Allow adhesive to dry thoroughly before hanging insulation: 24-48 hours.
Step 4. Hang Insulation
Step 5. Secure with Washer
Secure insulation in place with a self-locking washer. (Bend over or clip off the spindle.)
Additional information
Weight | .5 lbs |
---|---|
Dimensions | 2 × .5 × .5 in |